EROSION CONTROL MEASURES AT THE ASABA AIRPORT, OSHIMILI SOUTH LOCAL GOVERNMENT AREA

Erosion Control Measures at the Asaba Airport, Oshimili South Local Government Area
New Projects

Project Gallery (3)

Project Description

The project **“Erosion Control Measures at the Asaba Airport, Oshimili South Local Government Area”** aligns with the following Sustainable Development Goals (SDGs):

* **SDG 9 – Industry, Innovation and Infrastructure:** as it protects critical transport infrastructure from environmental degradation.
* **SDG 11 – Sustainable Cities and Communities:** due to its role in enhancing environmental safety and resilience.
* **SDG 13 – Climate Action (secondary relevance):** by addressing erosion and mitigating environmental impacts associated with climate change.

---

### **Project Description**

The project involves the implementation of erosion control measures at Asaba Airport to protect the facility and surrounding areas from environmental degradation. It includes the construction of drainage channels, embankments, and other protective structures designed to control surface runoff and prevent soil erosion. These measures are necessary to safeguard the integrity of the airport infrastructure and ensure safe operations.

The project is expected to reduce the risk of erosion-related damage, improve environmental sustainability, and enhance the safety of airport operations. It will also help preserve surrounding land and infrastructure, thereby supporting long-term development in the area. Additionally, the initiative contributes to climate resilience and promotes sustainable management of environmental resources.

Contract Sum

₦3,698,437,928.13

Sustainable Development Goals (SDGs) Impacts

Good Health and Well-Being

Good Health and Well-Being

Industry, Innovation and Infrastructure

Industry, Innovation and Infrastructure

Sustainable Cities and Communities

Sustainable Cities and Communities

Project Information

Contract Period

12 MONTHS

Progress

15%

Ministry/MDA

STATE TENDERS BOARD

CNO Reference

DSPPC/CNO/26/1998

Year

2026

Date Awarded

09/02/2026

Expected Completion

09/02/2027

Location (LGA)

Oshimili South

Address

Asaba Airport, Oshimili South Local Government Area

Contractor

LEVANT CONSTRUCTION LIMITED

Category

Works

Coordinates

Lat: 6.20777125, Long: 6.70181323,