REHABILITATION/CONSTRUCTION OF OKWETOLOR/OKOBIA/ARAGBA ROAD, WITH SPUR TO OKOGUME (PHASE II), OKPE LOCAL GOVERNMENT AREA

Ongoing

Project Description

The rehabilitation and construction of Okwetolor–Okobia–Aragba Road with a spur to Okogume (Phase II) in Okpe Local Government Area, by Rt. Hon. Sheriff Oborevwori, is aimed at improving road connectivity and transportation through the rehabilitation and construction of the road and its connecting spur. The road includes a 12,565m length with a 9.3m pavement width. The scope of work includes site clearance, scarification of old asphalt surface, removal of top soil and unsuitable materials, sharp sand filling, sharp sand for replacement of topsoil and unsuitable material removal, sharp sand filling, shoulder grassing, desilting of existing drains, demolition of old undersized drains, concret box culverts, concrete slabs and pavement surfacing consisting of two layers of asphalts, 500mm HRA binder course and 40mm HRA wearing course.

The project will enhance the movement of people, goods, and services, improve access to surrounding communities, stimulate economic and social activities and contribute to sustainable infrastructure and rural development in Okpe Local Government Area.

Sustainable Development Goals (SDGs) Impacts

Decent Work and Economic Growth

Decent Work and Economic Growth

Industry, Innovation and Infrastructure

Industry, Innovation and Infrastructure

Sustainable Cities and Communities

Sustainable Cities and Communities

Project Information

Contract Period

18 MONTHS

Progress

35%

Ministry/MDA

STATE TENDERS BOARD

CNO Reference

DSPPC/CNO/1602

Year

2025

Date Awarded

20/06/2025

Expected Completion

31/12/2026

Location (LGA)

Okpe

Address

Okwetolor/Okobia/Aragba Road

Contractor

Y & W INTERNATIONAL LIMITED

Category

Works

Coordinates

Lat: 5.72613900, Long: 6.13944410,

Lat: 5.73527200, Long: 5.79616580,